HOTEL ACCESS · MALAYSIA SELECTION
HUNE 0309-2
Source-listed values: Power-off delay: Approximately 15 seconds after card removal; Panel material: PC; manufacturer claims flame-retardant performance without a cited test report. Check the source and configuration notes below.
8 published fields · Specification data available · Reviewed 7 October 2026

Product artwork

Parameters from the linked sources
What the published attributes mean for your project
Power and maintenance planning
Power-off delay: Approximately 15 seconds after card removal
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Product category | Chinese-market lock or accessory | Published product detail |
| Source scope | Own Chinese manufacturer detail; export availability unconfirmed | Published product detail |
| Data scope | Published model identity only; numerical specifications not verified | Published product detail |
| Compatible card | Low-frequency contactless hotel card; ordinary bank/ID cards do not enable power | Visually inspected manufacturer graphic on this exact detail page; stated values, not independently tested |
| Power-off delay | Approximately 15 seconds after card removal | Visually inspected manufacturer graphic on this exact detail page; stated values, not independently tested |
| Panel material | PC; manufacturer claims flame-retardant performance without a cited test report | Visually inspected manufacturer graphic on this exact detail page; stated values, not independently tested |
| Relay component marking | 30 A / 240 VAC / 28 VDC on illustrated relay; not a whole-device rating | Visually inspected manufacturer graphic on this exact detail page; stated values, not independently tested |
| Connection labels | IN live input; OUT live output; N neutral; two N terminals, one needed | Visually inspected manufacturer graphic on this exact detail page; stated values, not independently tested |
Documents and installation guidance
- 0309-2 manufacturer product graphic
Product graphic, not an installation or operating manual
- 0309-2 manufacturer product graphic
Product graphic, not an installation or operating manual
Configuration and procurement checks
Unpublished or unverified items
- Current installation drawing and ordered mortise / handing
- Model-specific environmental, fire-door and radio evidence
- Tested PMS release and local service terms
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
Original evidence pages
Reviewed 7 October 2026.
