HOTEL ACCESS · MALAYSIA SELECTION

HUNE 0309C

Source-listed values: Working voltage: AC110~250V(其他电压版本可定制,如DC12V). Check the source and configuration notes below.

11 published fields · Specification data available · Reviewed 7 October 2026

HUNE 0309C — source-published image

Product artwork

HUNE 0309C — model-specific selection graphic; Working voltage: AC110~250V(其他电压版本可定制,如DC12V); 最大负载电流: 40A; 外壳材质: 阻燃PC; Published fields: 11.

Parameters from the linked sources

Source artwork. Check the ordered finish and configuration against the supplier’s documents. Original product detail

What the published attributes mean for your project

Power and maintenance planning

Working voltage: AC110~250V(其他电压版本可定制,如DC12V)

Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.

Published product attributes

AttributePublished valueSource
Product categoryChinese-market lock or accessoryPublished product detail
Source scopeOwn Chinese manufacturer detail; export availability unconfirmedPublished product detail
支持卡片类型Mifarel,Mifare Plus,Milare Desfire(卡片类型支持定制)Published product detail
Working voltageAC110~250V(其他电压版本可定制,如DC12V)Published product detail
最大负载电流40APublished product detail
最大功率8800WPublished product detail
静态功耗约1WPublished product detail
延时时间出厂默认15秒,延时时长支持定制Published product detail
状态指示灯蓝色指示灯(可定制其他颜色)Published product detail
外壳材质阻燃PCPublished product detail
净重150gPublished product detail

Documents and installation guidance

Technical document check

品牌尚未公布

No matching public technical-document link was found in the sources checked.

Document search: 2026-10-14. No public exact-model file link verified. Official page directs users to WeChat aftersales QR for operation instructions and installation demonstrations.

Official document or support entry — Official product instruction model / manual page

Sources and search scope

Official download center and manual page for missing HUNE models.

Configuration and procurement checks

Unpublished or unverified items

  • Model-specific installation manual and Malaysia export configuration not verified

Malaysia project acceptance

  1. Check the ordered product against your measured door or accessory schedule, then test an installation sample.
  2. Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
  3. Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.

Original evidence pages

  1. Exact product / document source 1

Reviewed 7 October 2026.