HOTEL ACCESS · MALAYSIA SELECTION
iLockey EC02-16F
Source-listed values: Operating Voltage: DC 12V. Check the source and configuration notes below.
7 published fields · Partial public specification · Reviewed 7 October 2026

Model parameters
What the published attributes mean for your project
Power and maintenance planning
Operating Voltage: DC 12V
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Model | EC02-16F | Published product detail |
| Floor Control Capacity | 16 floors (Expandable with additional modules) | Published product detail |
| Working Frequency | 13.56MHz | Published product detail |
| Operating Voltage | DC 12V | Published product detail |
| Protective Coating | Anti-interference and moisture-proof PCB treatment | Published product detail |
| Database Integration | Synchronized database with guest room locks (One-card solution) | Published product detail |
| Product category | Elevator controller | Published product detail |
Documents and installation guidance
Technical document check
品牌尚未公布
No matching public technical-document link was found in the sources checked.
Document search: 2026-10-14. Catalogues/brochures found; no verified exact current model manual link in searched range.
Official document or support entry — Official document center
Sources and search scope
Bounded official support/download center plus representative exact-model searches; existing documented records excluded.
- Document Download — Brochures and catalogues.
- M1 Smart bluetooth locks — 10-page M1 product brochure inspected; excluded for M1-TTlock because current product has fingerprint/8AA/6068 versus brochure no fingerprint/4AA/other mortise.
- M1-TTlock product page — Verified incompatible configuration with legacy M1 brochure.
- Collected product detail source — model identity reference.
Configuration and procurement checks
Unpublished or unverified items
- Operating manual: pending.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
