HOTEL ACCESS · MALAYSIA SELECTION

iLockey ESS-MF40A

Source-listed values: Operating Voltage: AC 65V – 260V (Wide voltage adaptability); Max Load Current: 40A (High-capacity relay for AC and high-power appliances). Check the source and configuration notes below.

8 published fields · Specification data available · Reviewed 7 October 2026

iLockey ESS-MF40A — model-specific selection graphic; Operating Voltage: AC 65V – 260V (Wide voltage adaptability); Power-Off Delay: 15 seconds (Exit delay for guest convenience); Shell Material: Fire-retardant PC / ABS plastic; Max Load Current: 40A (High-capacity relay for AC and high-power appliances).

Model parameters

Model-specific parameter diagram.

What the published attributes mean for your project

Power and maintenance planning

Operating Voltage: AC 65V – 260V (Wide voltage adaptability)

Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.

Published product attributes

AttributePublished valueSource
ModelESS-MF40APublished product detail
Operating VoltageAC 65V – 260V (Wide voltage adaptability)Published product detail
Max Load Current40A (High-capacity relay for AC and high-power appliances)Published product detail
Recognition Frequency13.56MHz (Identifies specific hotel RFID cards only)Published product detail
Power-Off Delay15 seconds (Exit delay for guest convenience)Published product detail
Shell MaterialFire-retardant PC / ABS plasticPublished product detail
Safety Testing24-hour continuous testing under varying load conditionsPublished product detail
Product categoryEnergy saving switchPublished product detail

Documents and installation guidance

Technical document check

品牌尚未公布

No matching public technical-document link was found in the sources checked.

Document search: 2026-10-14. Catalogues/brochures found; no verified exact current model manual link in searched range.

Official document or support entry — Official document center

Sources and search scope

Bounded official support/download center plus representative exact-model searches; existing documented records excluded.

Configuration and procurement checks

Unpublished or unverified items

  • Operating manual: pending.

Malaysia project acceptance

  1. Check the ordered product against your measured door or accessory schedule, then test an installation sample.
  2. Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
  3. Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.

Original evidence pages

  1. Exact product / document source 1

Reviewed 7 October 2026.