HOTEL ACCESS · MALAYSIA SELECTION
iLockey IC800-TTlock
Source-listed values: Power supply: 4pcs Alkaline batteries; Battery life: 10,000 times. Check the source and configuration notes below.
14 published fields · Specification data available · Reviewed 7 October 2026

Model parameters
What the published attributes mean for your project
Credentials and front-desk workflow
unlock way: APP+Card
Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.
Power and maintenance planning
Power supply: 4pcs Alkaline batteries
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Product category | ttlock-smart-lock | Published product detail |
| Model Number | IC930-TTLock | Published product detail |
| App name | TT LOCK | Published product detail |
| unlock way | APP+Card | Published product detail |
| Card capability | 100 pcs | Published product detail |
| Communication | Bluetooth | Published product detail |
| Power supply | 4pcs Alkaline batteries | Published product detail |
| Battery life | 10,000 times | Published product detail |
| Card type | M1 card | Published product detail |
| Support IOS | IOS7.0 or above, Android4.4 or above | Published product detail |
| Unlock time | 1.5 s | Published product detail |
| working humidity | 15%RH~93%RH | Published product detail |
| working temperature | -25~70 degree | Published product detail |
| Official page SKU | IC800-TTlock | Published product detail |
Documents and installation guidance
- Official catalogue (model named)
Manufacturer catalogue; named-model reference.
Configuration and procurement checks
Source and variant differences
- Official page SKU IC800-TTlock differs from model number IC930-TTLock; confirm configuration with manufacturer.
Unpublished or unverified items
- Exact Alibaba product listing not verified.
- Per-model installation manual not verified.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
