HOTEL ACCESS · MALAYSIA SELECTION
KADEL Hotel room security door locks
Source-listed values: Material: Stainless steel (grade only where separately stated); Battery life claim: 12–24 months; manufacturer claim. Check the source and configuration notes below.
7 published fields · Partial public specification · Reviewed 8 October 2026

Product artwork

Parameters from the linked sources
What the published attributes mean for your project
Door fit and replacement cost
Mortise: ANSI mortise
Compare these measurements with your existing doors. Before covering old cut-outs or changing the mortise, check the matching drawing and fit a sample.
Power and maintenance planning
Battery life claim: 12–24 months; manufacturer claim
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Material | Stainless steel (grade only where separately stated) | Published product detail |
| Card frequency | 13.56 MHz MIFARE | Published product detail |
| Batteries | 4 × AA alkaline | Published product detail |
| Battery life claim | 12–24 months; manufacturer claim | Published product detail |
| Mortise | ANSI mortise | Published product detail |
| Certification claim | CE/FCC support stated; certificates not verified | Published product detail |
| Hotel app shown | Works with TTHotel APP | Printed graphic statement; exact software licensing and installed configuration unverified. Official own-model detail gallery; visually checked 2026-10-08. |
Qualification scope
Request the model-specific certificate number, test report and applicable door-assembly documentation.
Documents and installation guidance
- Hotel room security door locks official gallery graphic
Product/configuration photograph or drawing.
Configuration and procurement checks
Unpublished or unverified items
- TTHotel graphic; PMS integration details: pending.
- No new model-specific installation manual found in this gallery review.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
Original evidence pages
Reviewed 8 October 2026.
