HOTEL ACCESS · MALAYSIA SELECTION
LOCSTAR 8105-RF-BXG
Source-listed values: Material: Stainless-steel panels; stainless-steel mortise latch; alloy key; Power supply: 4 AA alkaline batteries. Check the source and configuration notes below.
14 published fields · Specification data available · Reviewed 8 October 2026

Product artwork

Parameters from the linked sources
What the published attributes mean for your project
Door fit and replacement cost
Mortise endurance claim: Around 200,000 cycles
Compare these measurements with your existing doors. Before covering old cut-outs or changing the mortise, check the matching drawing and fit a sample.
Credentials and front-desk workflow
Unlock methods: Mifare S50 card (13.56 MHz) and mechanical key
Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.
Power and maintenance planning
Power supply: 4 AA alkaline batteries
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
Documents and installation guidance
- LOCSTAR 2024 hotel-lock technical table and dimension drawing
Manufacturer catalogue printed page 14, exact printed variant 8105-RF-BXG; technical table and diagram visually inspected 2026-10-08. Data applies to this catalogue variant only, not all products sharing its numerical model stem. Values are manufacturer declarations. Catalogue, not operating or installation manual.
Configuration and procurement checks
Source and variant differences
- Same page prose says door thickness 38–55 mm while technical table says 38–60 mm; confirm exact installed mortise/door configuration.
- Catalogued endurance and voltage values may differ from current product-page values; do not silently merge across hardware revisions.
Unpublished or unverified items
- Current exact variant availability, Malaysian approval and per-model installation manual not verified.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
Continue your product checks
From this supplier
Same published category
Compare published specifications for products in this category.
