HOTEL ACCESS · MALAYSIA SELECTION
Hongxing HX860HGT
Source-listed values: Power voltage: DC 6 V; Power: 4 AA high-energy alkaline batteries. Check the source and configuration notes below.
8 published fields · Specification data available · Reviewed 7 October 2026

Model parameters
Product advantages and buyer fit
- Electronic access with a mechanical fallback offers an emergency option when correctly configured.
What the published attributes mean for your project
Credentials and front-desk workflow
Battery openings, maker claim: >15,000
Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.
Power and maintenance planning
Power voltage: DC 6 V
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Product category | Hotel card lock | Published product detail |
| Reading distance | About 3 cm | Published product detail |
| Card options | Apartment ID; hotel EM, TEMIC or MF1 | Published product detail |
| Power voltage | DC 6 V | Published product detail |
| Power | 4 AA high-energy alkaline batteries | Published product detail |
| Battery openings, maker claim | >15,000 | Published product detail |
| Low voltage alarm | <4.6 V, audible/visual | Published product detail |
| Reader design | Contactless, sealed design | Published product detail |
Documents and installation guidance
Technical document check
品牌尚未公布
No matching public technical-document link was found in the sources checked.
Document search: 2026-10-14. Homepage timed out; official-domain PDF/说明书/下载中心 search no matches.
Official document or support entry — official website/support navigation
Sources and search scope
Search scope: official document centres and official-domain results for records without a registered document link.
- Official documentation discovery entry — Homepage timed out; official-domain PDF/说明书/下载中心 search no matches.
- Collected product detail source — model identity reference.
Configuration and procurement checks
Unpublished or unverified items
- Data retrieved from indexed official detail text; direct page currently times out.
- Exact installation drawing, current sale status, certificate and Malaysia acceptance unverified.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
