HOTEL ACCESS · MALAYSIA SELECTION
ONLYSMART 100AJ
Source-listed values: Material: PVC; Working Voltage: 220V. Check the source and configuration notes below.
6 published fields · Partial public specification · Reviewed 7 October 2026

Product artwork

Parameters from the linked sources
What the published attributes mean for your project
Power and maintenance planning
Working Voltage: 220V
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Product category | Electronic doorplate | Published product detail |
| Published detail 1 | Hotel Door Bell | Published product detail |
| Published detail 2 | Hotel Door Bell | Published product detail |
| Material | PVC | Published product detail |
| Working Voltage | 220V | Published product detail |
| Published detail 5 | Standard DINGDONG Voice | Published product detail |
Documents and installation guidance
Technical document check
品牌尚未公布
No matching public technical-document link was found in the sources checked.
Document search: 2026-10-14. Official download center pages 1–6 has exact model diagrams/datasheets; all 20 tested endpoints password-required; no public PDF bytes verified.
Official document or support entry — official support/download center
Sources and search scope
Search scope: official document centres and official-domain results for records without a registered document link.
- Official documentation discovery entry — Official download center pages 1–6 has exact model diagrams/datasheets; all 20 tested endpoints password-required; no public PDF bytes verified.
- Official download pagination — Checked listed titles and scoped matches.
- Official download pagination — Checked listed titles and scoped matches.
- Official download pagination — Checked listed titles and scoped matches.
- Official download pagination — Checked listed titles and scoped matches.
- Collected product detail source — model identity reference.
Configuration and procurement checks
Unpublished or unverified items
- Exact-model installation manual and Malaysia approval scope not verified.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
Original evidence pages
Reviewed 7 October 2026.
