HOTEL ACCESS · MALAYSIA SELECTION
ORBITA S3078
Source-listed values: Material: 304 Stainless Steel material; Working Voltage: DC6V or 4 AA Alkaline batteries. Check the source and configuration notes below.
28 published fields · Specification data available · Reviewed 2026-10-12

Product artwork

Parameters from the linked sources
Product advantages and buyer fit
- Battery-powered Mifare access includes a low-voltage warning to help staff plan maintenance.
What the published attributes mean for your project
Door fit and replacement cost
Door Thickness: 38-70mm
Compare these measurements with your existing doors. Before covering old cut-outs or changing the mortise, check the matching drawing and fit a sample.
Credentials and front-desk workflow
Unlocking record: 1680PCS
Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.
Power and maintenance planning
Working Voltage: DC6V or 4 AA Alkaline batteries
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
Documents and installation guidance
- S3078 Hotel Lock Product manual(size:2.9M)
Officially linked manual; Google Drive preview did not expose contents; verify model applicability
- S3078 installation and user manual — ORBITA USA
PDF downloaded and text read; exact model named on cover. Specifications: printed pp. 2–3; installation: pp. 4–7. Revision date not established; confirm match to ordered regional configuration.
Configuration and procurement checks
Source and variant differences
- The headline door thickness and technical-section range may differ; obtain the model's drilling drawing and chosen mortise before installation.
Unpublished or unverified items
- Certificate scope and Malaysia approval are not verified.
- Confirm the regional manual revision and mortise against the ordered configuration before fitting.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
Original evidence pages
Reviewed 2026-10-12.
