HOTEL ACCESS · MALAYSIA SELECTION

PRND Hotel elevator controller

Source-listed values: Power supply: 24V / 12V. Check the source and configuration notes below.

8 published fields · Specification data available · Reviewed 7 October 2026

PRND / Pulande Hotel elevator controller — model-specific selection graphic; Power supply: 24V / 12V; Published fields: 8; Document links: 0; Evidence status: Source-attributed record.

Model parameters

Model-specific parameter diagram.

What the published attributes mean for your project

Power and maintenance planning

Power supply: 24V / 12V

Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.

Published product attributes

AttributePublished valueSource
Place of OriginShenzhen, ChinaPublished product detail
Minimum Order Quantity1Published product detail
Standard Packaging1pc in 1 cartonPublished product detail
Delivery Time1-10 working daysPublished product detail
Payment TermsT/T,Western UnionPublished product detail
Supply Ability2000pcs / monthPublished product detail
Power supply24V / 12VPublished product detail
Certification claimCE; document not verifiedPublished product detail

Qualification scope

Request the model-specific certificate number, test report and applicable door-assembly documentation.

Documents and installation guidance

Technical document check

品牌尚未公布

No matching public technical-document link was found in the sources checked.

Document search: 2026-10-14. Official center lists three resources; exact RF100 datasheet verified. Generic V10 manual not assigned; FR100-named hole PDF excluded due filename ambiguity.

Official document or support entry — official support/download center

Sources and search scope

Search scope: official document centres and official-domain results for records without a registered document link.

Configuration and procurement checks

Unpublished or unverified items

  • No downloadable model manual verified.

Malaysia project acceptance

  1. Check the ordered product against your measured door or accessory schedule, then test an installation sample.
  2. Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
  3. Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.

Original evidence pages

  1. Exact product / document source 1

Reviewed 7 October 2026.