HOTEL ACCESS · MALAYSIA SELECTION
PRND PC01
This record identifies PC01 in PRND / Pulande’s public catalogue. Technical values and installation documents still need confirmation.
8 published fields · Specification data available · Reviewed 7 October 2026

Model parameters
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Place of Origin | Shenzhen, China | Published product detail |
| Minimum Order Quantity | 1 | Published product detail |
| Standard Packaging | 100pcs in 1 carton | Published product detail |
| Delivery Time | 1-10 working days | Published product detail |
| Payment Terms | Western Union,T/T | Published product detail |
| Supply Ability | 500000pcs / month | Published product detail |
| Frequency | 125 kHz | Published product detail |
| Certification claim | CE stated; document not verified | Published product detail |
Qualification scope
Request the model-specific certificate number, test report and applicable door-assembly documentation.
Documents and installation guidance
Technical document check
品牌尚未公布
No matching public technical-document link was found in the sources checked.
Document search: 2026-10-14. Official center lists three resources; exact RF100 datasheet verified. Generic V10 manual not assigned; FR100-named hole PDF excluded due filename ambiguity.
Official document or support entry — official support/download center
Sources and search scope
Search scope: official document centres and official-domain results for records without a registered document link.
- Official documentation discovery entry — Official center lists three resources; exact RF100 datasheet verified. Generic V10 manual not assigned; FR100-named hole PDF excluded due filename ambiguity.
- Collected product detail source — model identity reference.
Configuration and procurement checks
Unpublished or unverified items
- No standalone PDF verified.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
