HOTEL ACCESS · MALAYSIA SELECTION
SMARTEK A820-C/A860-C/A830-C
Source-listed values: Material: Zinc alloy; Power: 4 AAA batteries. Check the source and configuration notes below.
7 published fields · Partial public specification · Reviewed 7 October 2026

Model parameters
Product advantages and buyer fit
- Offline storage access can share the V8 hotel guest card workflow.
What the published attributes mean for your project
Credentials and front-desk workflow
Opening: MIFARE card
Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.
Power and maintenance planning
Power: 4 AAA batteries
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
| Attribute | Published value | Source |
|---|---|---|
| Material | Zinc alloy | Published product detail |
| Opening | MIFARE card | Published product detail |
| Power | 4 AAA batteries | Published product detail |
| Response, maker claim | 0.5 seconds | Published product detail |
| Standby, maker claim | Up to 12 months | Published product detail |
| System | V8 offline | Published product detail |
| Product category | Hotel cabinet lock | Published product detail |
Documents and installation guidance
Technical document check
品牌尚未公布
No matching public technical-document link was found in the sources checked.
Document search: 2026-10-14. No publicly verified exact-model link in searched range.
Official document or support entry — Official Download center
Sources and search scope
Bounded official support/download center plus representative exact-model searches; existing documented records excluded.
- Download list — Public download list empty; E300/A210/S1 exact official manual queries found no matching official document.
- Collected product detail source — model identity reference.
Configuration and procurement checks
Unpublished or unverified items
- Model-specific manual not retrieved.
- Certificates and lifecycle figures are maker claims; reports and Malaysia acceptance unverified.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
