HOTEL ACCESS · MALAYSIA SELECTION

YANGGE YGS-9907

Source-listed values: Material: Alloy; Power supply: 4pcs AAA batteries. Check the source and configuration notes below.

8 published fields · Specification data available · Reviewed 7 October 2026

YANGGE YGS-9907 — model-specific selection graphic; Unlock method: Card, Key; Battery life: Over 15000 times; Power supply: 4pcs AAA batteries; Material: Alloy.

Model parameters

Model-specific parameter diagram.

What the published attributes mean for your project

Credentials and front-desk workflow

Unlock method: Card, Key

Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.

Power and maintenance planning

Power supply: 4pcs AAA batteries

Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.

Published product attributes

AttributePublished valueSource
MaterialAlloyPublished product detail
Available colorBlack, GoldPublished product detail
Unlock methodCard, KeyPublished product detail
Power supply4pcs AAA batteriesPublished product detail
Battery lifeOver 15000 timesPublished product detail
Reading & writing time<0.25sPublished product detail
Applicable chipMifare 1 (13.56Mhz)Published product detail
Product categoryHotel access productPublished product detail

Documents and installation guidance

Technical document check

品牌尚未公布

No matching public technical-document link was found in the sources checked.

Document search: 2026-10-14. No new exact-model mapping confirmed. YGS-8835B official PDF filename is a candidate pending exact cover or official product association.

Official document or support entry — Official YGS / Yang Ge Resources navigation

Sources and search scope

Official Resources / Knowledge Centre and site-restricted manual/download searches for missing YGS models.

Configuration and procurement checks

Unpublished or unverified items

  • Model-specific door thickness and dimensioned drilling template require confirmation
  • IP rating and Malaysia approvals not verified

Malaysia project acceptance

  1. Check the ordered product against your measured door or accessory schedule, then test an installation sample.
  2. Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
  3. Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.

Original evidence pages

  1. Exact product / document source 1

Reviewed 7 October 2026.