HOTEL ACCESS · MALAYSIA SELECTION

Yorfan RF18

Source-listed values: Material: zinc alloy; Powered by: 2450 3V battery. Check the source and configuration notes below.

6 published fields · Partial public specification · Reviewed 7 October 2026

Yorfan RF18 — source-published image

Product artwork

Yorfan RF18 — model-specific selection graphic; Unlock: IC card; Powered by: 2450 3V battery; Material: zinc alloy; Published fields: 6.

Parameters from the linked sources

Source artwork. Check the ordered finish and configuration against the supplier’s documents. Original product detail

What the published attributes mean for your project

Credentials and front-desk workflow

Unlock: IC card

Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.

Power and maintenance planning

Powered by: 2450 3V battery

Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.

Published product attributes

AttributePublished valueSource
ModelRF18Published product detail
Materialzinc alloyPublished product detail
UnlockIC cardPublished product detail
Powered by2450 3V batteryPublished product detail
2 lengthL20 for steel locker, L30 for wood lockerPublished product detail
Product categoryelectronic-cam-lockPublished product detail

Documents and installation guidance

Technical document check

品牌尚未公布

No matching public technical-document link was found in the sources checked.

Document search: 2026-10-14. The public center provides shared software and installation resources, but no exact-model hardware applicability list was verified for the remaining records.

Official document or support entry — Shared catalogue, software/SDK and installation references; check the listed model scope.

Sources and search scope

Official YORFAN Download center and its catalogue, TTLock and Installation Manual targets, plus previously collected model detail evidence. No blanket mapping of software manuals or generic installation drawings to every product.

Configuration and procurement checks

Unpublished or unverified items

  • The table lists values transcribed for this model.
  • Installation manual: pending.

Malaysia project acceptance

  1. Check the ordered product against your measured door or accessory schedule, then test an installation sample.
  2. Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
  3. Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.

Original evidence pages

  1. Exact product / document source 1

Reviewed 7 October 2026.