HOTEL ACCESS · MALAYSIA PROJECT SELECTION
ZKTeco ZL500
Open the linked documents for this product, then confirm the model, revision and configuration for your order.
23 source-linked attributes · Reviewed 6 October 2026


Product artwork

Parameters from the linked sources
Product advantages and procurement fit
- Remote door-status visibility can reduce room-by-room status checks when the gateway and ZKBioHLMS system are installed.
- One-card permissions can combine room access, shared facilities and elevator access within the configured system.
- Documented 62.5 mm backset and 35–45 mm door range help identify retrofit incompatibility before ordering.
Product attributes
Values are attributed to the manufacturer or seller. Battery endurance, range and durability figures are published claims, with operating conditions required before comparison.
Identity & finish
| Attribute | Published value | Evidence |
|---|---|---|
| Material | Zinc alloy and PMMA | Manufacturer product page |
| Backset | 62.5 mm (installation guide) | Manufacturer installation guide |
| Encoder | D147-H | Manufacturer product page |
| Communication | ZigBee | Manufacturer product page |
| Gateway | SLG410 (quick-start guide) | Manufacturer product page |
| Mobile credential | HTML5 (H5) smartphone unlocking with system deployment | Manufacturer product page |
| Spindle A | 40 mm for 35–45 mm doors | Manufacturer installation guide |
| Spindle B | 75 mm for 35–45 mm doors | Manufacturer installation guide |
| Screw C | 25 mm for 35–45 mm doors | Manufacturer installation guide |
Door fit & installation
| Attribute | Published value | Evidence |
|---|---|---|
| Mortise | American standard, 5 latches | Manufacturer product page |
| Door thickness | 35–45 mm | Manufacturer product page |
| Dimensions | 298 × 70 × 20 mm | Manufacturer product page |
| Handing | Left/right, inward/outward per installation guide | Manufacturer installation guide |
Power & maintenance
| Attribute | Published value | Evidence |
|---|---|---|
| Power | 4 × AA alkaline batteries; batteries not included | Manufacturer product page |
| Battery life | 1 year, manufacturer claim; usage conditions not stated | Manufacturer product page |
| Low battery warning | Audible beep | Manufacturer product page |
Credentials & communication
| Attribute | Published value | Evidence |
|---|---|---|
| Card protocol | ISO 14443 Type A, S50 / S70 | Manufacturer product page |
| Software | ZKBioSecurity / ZKBioHLMS | Manufacturer product page |
| Integration | Open API; project-specific integration required | Manufacturer product page |
Access management
| Attribute | Published value | Evidence |
|---|---|---|
| Mechanical override | Supplied mechanical key | Manufacturer installation guide |
Environment & durability
| Attribute | Published value | Evidence |
|---|---|---|
| Operating temperature | −20 to +55 °C | Manufacturer product page |
| Operating humidity | 5–95% RH | Manufacturer product page |
Supply & certification
| Attribute | Published value | Evidence |
|---|---|---|
| Manufacturer-listed certification | CE-RED; certificate document not independently reviewed | Manufacturer product page |
Datasheets, installation and setup documents
- ZL500 Installation Guide V1.0, English / Spanish
PDF opened and model checked; 30 pages
- ZL500 Quick Start Guide V1.0
PDF opened and model checked
Configuration differences and missing evidence
Resolve before ordering
- Installation guide explicitly excludes doors thicker than 45 mm.
- New locks remain in always-open mode until initial card commissioning. Register authorization, time-sync and room cards before handover.
- Do not infer fire-door approval or waterproof rating from CE-RED.
Request these missing attributes
- Panel dimensions and drilling drawing where absent above
- Model-specific IP and fire-test evidence
- Current warranty and local service terms
- Named PMS release and tested interface
Malaysia project acceptance
- Match the ordered mortise and handing to a measured door schedule and test one fitted sample.
- Test checkout, lost-card handling, staff permissions and battery-failure access with the actual software.
- Confirm the local installation and support provider and obtain documents applicable to the ordered radio and door assembly.
Original sources
- Manufacturer model details
- Manufacturer regional / additional model page
- Manufacturer regional / additional model page
Reviewed 6 October 2026.
Additional model specifications and documents
Reviewed 8 October 2026. Figures describe the cited configuration and do not establish local stock or approval.
Source-linked documents
- ZL500 installation guide V1.0 — English and Spanish
Readable30-page official PDF; American5-latch mortise. Model and version checked; ordered variant still requires confirmation.
- ZL500 quick-start guide V1.0 — ZKBioHLMS configuration
Readable official one-sheet English/Spanish PDF; software and gateway commissioning, not the mechanical installation template.
Source and configuration differences
- Current Malaysia stock, certificates and exact drilling template unavailable; manual version match to ordered unit not confirmed.
