HOTEL ACCESS · MALAYSIA SELECTION

BONWIN Hotel Control System

Source-listed values: Rated Power: 24W. Check the source and configuration notes below.

5 published fields · Partial public specification · Reviewed 7 October 2026

BONWIN Hotel Control System — model-specific selection graphic; Rated Power: 24W; Communications bus II: RS232, 9600BPS, for better expansibility; Published fields: 5; Document links: 0.

Model parameters

Model-specific parameter diagram.

What the published attributes mean for your project

Credentials and front-desk workflow

Communications bus II: RS232, 9600BPS, for better expansibility

Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.

Power and maintenance planning

Rated Power: 24W

Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.

Published product attributes

AttributePublished valueSource
Ethernet 10M/100MPublished product detail
ItemsDefinitions | IntroductionsPublished product detail
Rated Power24WPublished product detail
of guest roomsCommunications bus I | RS485, 9600BPS supports 3 switches of temperature controlling, 3 of network door locks and the identification switchPublished product detail
Communications bus IIRS232, 9600BPS, for better expansibilityPublished product detail

Documents and installation guidance

Technical document check

品牌尚未公布

No matching public technical-document link was found in the sources checked.

Document search: 2026-10-14. Official Brochure & Manual pages 1–3 checked; public BW883 family setup guide and explicit variant parameter sheets verified.

Official document or support entry — official support/download center

Sources and search scope

Search scope: official document centres and official-domain results for records without a registered document link.

Configuration and procurement checks

Unpublished or unverified items

  • Exact configuration/order code and installation manual require supplier confirmation

Malaysia project acceptance

  1. Check the ordered product against your measured door or accessory schedule, then test an installation sample.
  2. Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
  3. Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.

Original evidence pages

  1. Exact product / document source 1

Reviewed 7 October 2026.