HOTEL ACCESS · MALAYSIA SELECTION
BONWIN Hotel RCU Room Control Unit System
Source-listed values: Control cabinet dimensions: 500 × 400 × 90 mm; Control cabinet material: 1 mm painted steel plate. Check the source and configuration notes below.
19 published fields · Specification data available · Reviewed 2026-10-12

Product artwork

Parameters from the linked sources
What the published attributes mean for your project
Door fit and replacement cost
Control cabinet dimensions: 500 × 400 × 90 mm
Compare these measurements with your existing doors. Before covering old cut-outs or changing the mortise, check the matching drawing and fit a sample.
Credentials and front-desk workflow
System communication: TCP/IP
Check that the stated configuration fits your credentials and staff workflow. Test checkout and lost-credential handling.
Power and maintenance planning
Power module AC input: 110–220 V ±15%; 50–60 Hz
Plan consumables, service access and failure recovery around the stated power supply and endurance conditions.
Published product attributes
Documents and installation guidance
Technical document check
品牌尚未公布
No matching public technical-document link was found in the sources checked.
Document search: 2026-10-14. Official Brochure & Manual pages 1–3 checked; public BW883 family setup guide and explicit variant parameter sheets verified.
Official document or support entry — official support/download center
Sources and search scope
Search scope: official document centres and official-domain results for records without a registered document link.
- Official documentation discovery entry — Official Brochure & Manual pages 1–3 checked; public BW883 family setup guide and explicit variant parameter sheets verified.
- Official download pagination — Checked listed titles and scoped matches.
- Official download pagination — Checked listed titles and scoped matches.
- Collected product detail source — model identity reference.
Configuration and procurement checks
Unpublished or unverified items
- Exact configuration/order code and installation manual require supplier confirmation
- Exact ordered module list, channel ratings, model spelling, wiring drawing and Malaysia electrical applicability require supplier confirmation.
Malaysia project acceptance
- Check the ordered product against your measured door or accessory schedule, then test an installation sample.
- Before rollout, test the actual software and what happens at checkout, when a credential is lost and when power fails.
- Ask the quotation to name the installer and set out the applicable local documents, warranty and service coverage.
Continue your product checks
From this supplier
- Supplier profile
- Collected product catalogue
- BONWIN Hotel Control System
- BONWIN Smart Click Button Switch
